Ship PR Until Green
Implement on a branch, run tests, push, open a PR, wait for CI, and loop until checks pass and the PR is ready to merge.
This loop is republished with attribution. Full credit and the original content belong to the source linked above.
AI Skill Market Insights
Real data. Real impact.
Emerging
Developers
Kickoff Prompt
Copy this prompt and run it with your agent to start the loop.
Start the "Ship PR Until Green" loop.
Goal: PR is open with all CI checks passing
Max iterations: 10
Between iterations run: gh pr checks
Exit when: all PR checks are success
Step 1: Implement the change, test locally, push, open PR, and fix CI until green.
Self-pace this loop. After each iteration, run the check command, read the output, and only continue if the exit condition is not met. Stop when the exit condition passes or max iterations is reached. Give a short status update each pass.